[ad_1]
Last updated: July 12, 2023, at 23:21 IST
ISRO has already conducted a 24-hour “launch rehearsal” to simulate the complete launch preparation for the mission. (PTI image)
The mission is scheduled to launch at 2.35pm aboard the Mark 3 (LVM3) launch vehicle from Sriharikota Spaceport on July 14.
The Indian Space Research Organization said on Wednesday that it had completed a “mission readiness review” (MRR) for the Chandrayaan-3 mission to the moon. In a tweet, the Bengaluru-based National Space Agency said, “The (MRR) Board has authorized the launch. The countdown will begin tomorrow.”
ISRO has already conducted a 24-hour “launch rehearsal” to simulate the complete launch preparation for the mission.
The mission is scheduled to launch at 2.35pm aboard the Mark 3 (LVM3) launch vehicle from Sriharikota Spaceport on July 14.
(This story was not edited by the News18 staff and was published from a syndicated news agency feed – PTI)
[ad_2]